In order to meet Belwood Poultry’s impressive expanding operations, Fortis Group constructed a new 40,000 sq. ft. processing and packaging facility. The Design-Build project required specialized low-temperature processing and shipping areas, as well as extensive refrigeration, electrical back-up generator, and insulated cooler panel work.
The new facility adheres to CIFA Inspected and HACCP Recognized certifications, which requires specialty construction products and techniques that Fortis can provide through effective and economical solutions as a result of similar past projects. It was a privilege to add onto Belwood’s already cutting-edge and innovative operations.